ExPert Pipe Bucking Services

274 N.J. Theriot Road Port Fourchon, Louisiana

  • 20 years of service providing worldwide support for the Oil and Gas industry.
  • 53 acres located along slip B with 750 feet of dock side services maintained at 28 of draft.
  • Dock crane # 1 – 75 -ton hydraulic crane with 160 feet of boom.
  • Dock crane # 2 – 100 – ton hydraulic crane with 160 feet of boom.
  • Warehouse Storage Building
  • API Q1 Certification License #1332

Horizontal Torquing

– Capabilities: 2⅜” – 28” ~ 250,000 ft./lb.

  • OCTG Doubles (Chrome & Carbon)
  • Cementation Products & Accessories
  • Large OD Assemblies
  • Premium Connections
  • Torque-Turn Monitoring System

Doubling Services

Horizontal Torquing Drill Pipe Unit

  • 15” – 3½” EnerQuip Drill Pipe / Collar Make & Break
  • Doubles & Triples Capability
  • 200, 000 ft. lb. torque capacity
  • Torque-Turn Monitoring

Therma Spray Aluminum Coating

Wash Facility

High Pressure Internal Tubular Cleaning Pressures to 40K PSI

Climate Controlled Coatings

  • Certified Level 2 inspectors in accordance with SNT-TC-1A
  • State of the art equipment
  • Magnetic particle and dye penetrant testing
  • Follow established procedures from API, ASME, and AWS standards
  • Accelerated Cure Time
  • Subsea Epoxy Coatings
  • Buoyancy Repair



Heavy Lift Assembly Bay

NDE Inspection Services

Disassembly/Assembly

  • Utilize approved API and OEM Procedures to guide the removal process
  • Tag each component with unique identifier for Quality Control
  • Trained professional technicians provide high quality, repeatable results

Welding & Fabrication

  • Certified Welders – ASME section 9, DNV, ABS certification criteria
  • State of the art post weld heat treatment facility
  • Ability to weld on materials such as 316L, 2207 Super Duplex, X80, F22, etc.
  • Inconel Inlay to modify the box ends of service lines

Why Choose Us

  • ONE STOP SHOP!!!!
  • Highly capable 53 acre Facility strategically located on Slip B in Port Fourchon with 750’ dock frontage
  • Logistical planning options that reduce operational cycle times, enhance safety and reduce Carbon Emissions
  • Bucking equipment is permanently set out of the elements
  • 20 years experience in Deepwater offshore drilling/production operations
  • Covered work areas minimize weather related delays
  • Eliminate environmental impact with our state-of-the-art wash building and filtration system
  • Ship your Casing to ERS and Buck into doubles then TSA your VAM connections
  • 75 and 100 ton pedestal Cranes
  • Extreme Heavy Load handing equipment